Emergency drill for environmental emergencies
2018-01-15
1. General Manager Ge Baquan, the emergency commander, made a mobilization report before the drill.
2. Miao Weidong, the deputy commander-in-chief of the company's emergency response, explained the drill procedures, assigned the tasks of each group, and announced the labor discipline of the drill.
① Security teams: set up guards at all intersections, prohibit entry of irrelevant personnel, conduct evacuation guidance, control driving vehicles, and keep the road unobstructed.
②Communication team: report the disaster situation at the same emergency command center, and notify and guide employees to evacuate urgently.
③Ambulance team: bring the corresponding medical equipment and ambulance to set up a temporary ambulance station in the upwind direction to rescue the injured in time and rescue the injured in time.
④Rescue team: to ensure the normal operation of fire-fighting facilities, and prepare for the company's large-scale power outage, prepare for the start of fire-fighting power reserve energy, and wait for orders.
⑤ Material supply team: Provide materials and equipment needed by on-site rescuers.
⑥Voluntary fire brigade: Fight the leak site and assist external support forces to control the site. Prepare simulation exercise equipment, each in place.
3. The commander-in-chief Ge Baquan announced the official start of the drill. Xu Jiajun, an operator at the chlorination post, accidentally tripped over the chlorine pipeline during the operation, causing the pipeline to rupture and the liquid chlorine to leak.
4. Wu Qingquan, the leader of the chlorination post, immediately reported to the workshop director Ma Weidong. After hearing the news, Ma Weidong went to the scene to confirm the accident and reported to Deputy Commander Miao Weidong according to the notification procedure, suggesting that emergency rescue plans be activated.
5. After receiving the police, Miao Weidong announced the launch of an emergency rescue plan and then set up a temporary emergency command center. Immediately notify the electrician to cut off the power supply, turn off the pump to prevent fire, and notify the commander-in-chief Ge Baquan to start the company's emergency rescue plan, and set up an emergency headquarters on the spot, and set up an emergency rescue team and the company's fire brigade. Members of the emergency command organization and rescue team arrived at the emergency command center-outside the cordon at the entrance of the workshop to gather and report. The deputy commander Miao Weidong led the emergency rescue teams and the company's fire brigade to control the disaster on the spot.
6. Xu Jiajun, an operator at the chlorination post, inhaled liquid chlorine and fainted. The rescue team immediately lifted it to a place with fresh air to keep the respiratory tract unobstructed.
7. Emergency response personnel put on rubber gloves, protective clothing and positive pressure air breathing apparatus to enter the accident site, and the fire hydrant is also connected to water for standby. Turn on the fire-fighting water and sprinkler device to spray the leaking part, and the emergency personnel will enter the scene to check the cause, and take countermeasures to close the outlet valve of the leaking steel cylinder. If there is a poisoned person, they should be sent to a ventilated place immediately for emergency rescue and the professional department should be notified. Collect the flushing water into the accident emergency pool, and the staff of the chlorination department will clean up the site.
8. Laboratory personnel analyze the flushing water to determine whether the concentration of the waste liquid exceeds the standard. If it does not exceed the standard, it can enter the wastewater treatment station for treatment.
9. The test results were reported to the emergency commander. The test results did not exceed the standard. The commander announced the end of the exercise based on the test results, that is, the safety control on the accident site was cancelled, and the personnel of the chlorination department returned to work.

Scan Access Mobile Edition
Nantong Hongfu Dali Chemical Co., Ltd.
Contact: Mr. Ge(+86-13073222182)
Mr. Miu(+86-13646249666)
Mr. Cai(+86-13813733029)
Tel: +86-513-84812235
Fax: +86-513-84812868
URL: http://www.hfdlchem.cn
Email: caixr029@163.com
Add: No.5 Huanghai Erlu, Yanhai Economic Development Park, Rudong, Jiangsu, China
Zip code: 226407
Copyright©2023 Nantong Hongfu Dali Chemical Co., Ltd.