Nantong Hongfudali Chemical Co., Ltd. announced the first public announcement of the environmental impact assessment of the annual production of 8,000 tons (newly increased by 3,500 tons) of pinacol and the by-product calcium chloride
2017-03-15
Nantong Hongfudali Chemical Co., Ltd. intends to invest 8 million yuan in the construction of an existing plant on the south side of Huanghai 2nd Road, High-tech Industrial Park, Rudong Coastal Economic Development Zone, Jiangsu Province, with an annual output of 8,000 tons (an additional 3,500 tons) of pinacolone And the by-product calcium chloride, polymer oil technical transformation and expansion project. According to the "Environmental Impact Law of the People's Republic of China", "Construction Project Environmental Protection Management Regulations" and relevant documents, and entrusted by Nantong Hongfu Dali Chemical Co., Ltd., Suzhou Ketai Environmental Technology Co., Ltd. conducts environmental impact assessment for this project .
According to the relevant provisions of the “Interim Measures for Public Participation in Environmental Impact Assessment” document issued by the State Environmental Protection Administration, Huanfa 2006 [No. 28], the project’s environmental impact assessment information will be publicized. The public is welcome to actively participate and provide valuable opinions.
(1) The name and summary of the construction project
Project name: Nantong Hongfu Dali Chemical Co., Ltd. Annual output of 8,000 tons (newly increased by 3,500 tons) of pinacol and by-product calcium chloride, polymer oil technical transformation and expansion project
Project summary: South of Huanghai 2nd Road, High-tech Industrial Park, Rudong Coastal Economic Development Zone, Jiangsu Province. This project utilizes the existing workshops and public supporting facilities, and without changing the original process, the original Pinacolone production device is transformed, and the volume of the addition and condensation kettle is increased. After the project is completed, it will have an annual output of 8000 Production capacity of ton (an increase of 3,500 tons) of pinacol, 1,600 tons of by-products (an increase of 1,100 tons) of calcium chloride (reduced pure), and a by-product of 500 tons (an increase of 250 tons).
(2) The name and contact information of the construction unit of the construction project
Construction unit: Nantong Hongfu Dali Chemical Co., Ltd.
Contact person: Manager Ji
Tel: 15062776845
传 True:
E-mail:
Mailing address: Yangkou 2nd Road, Rudong Coastal Economic Development Zone, Jiangsu Province
(3) The name and contact information of the environmental impact assessment agency undertaking the assessment
EIA unit: Suzhou Ketai Environmental Technology Co., Ltd.
Contact person: Ms. Leng
Tel: 0512-68026617
Chuan True: 0512-68026619
Email: szktgzcy@126.com
Mailing address: Room 1802, Building 1, Runjie Building, No. 9 Dengwei Road, High-tech Zone, Suzhou
(4) Working procedures and main work content of environmental impact assessment
Work program:
Acceptance of entrustment → preparation stage work (including data collection, preliminary site survey and engineering analysis, environmental information publicity, etc.) → formal work stage (environmental status monitoring, engineering analysis, environmental impact prediction and evaluation) → report preparation stage (collecting work results, After the first draft of the report is formed, environmental information publicity, public participation in investigations, and report review)
Main work content:
Through engineering analysis and environmental status investigation, predict the scope and extent of the impact of the project construction on the water, air, sound, and ecological environment of the project area. Propose pollution prevention measures for water, air, sound, solid waste, etc., to coordinate the social and economic benefits of the proposed project with the environment, and to provide a scientific basis for the decision-making of the engineering construction and environmental management departments.
(5) Main matters for public opinion solicitation
① Attitude towards the site selection of this project;
② The impact of this project on your life;
③ What do you think is the biggest environmental impact of this project?
④ What kind of environmental protection measures do you think should be taken;
⑤ What kind of role do you think this project will play in local economic development;
⑥ Other suggestions on environmental protection.
(6) Main methods of public comments
After this information publicity, the public can express their opinions and opinions on the project construction and environmental assessment work to the construction unit or environmental assessment unit through telephone, fax, letter, email or face-to-face interview, and please indicate "Annual production 8000 tons (newly added 3,500 tons) of pinacol and the by-product calcium chloride, and the public opinion on the technical transformation and expansion project of polymer oil". When the public expresses their opinions, please try their best to indicate the date, your real name and contact information, so that they can give you feedback as needed. (Do not accept issues that are not related to environmental protection)
The publicity time is 10 working days from the date of publicity.
Scan Access Mobile Edition
Nantong Hongfu Dali Chemical Co., Ltd.
Contact: Mr. Ge(+86-13073222182)
Mr. Miu(+86-13646249666)
Tel: +86-513-84812235
Fax: +86-513-84812868
URL: http://www.hfdlchem.cn
Email: caixr029@163.com
Add: No.5 Huanghai Erlu, Yanhai Economic Development Park, Rudong, Jiangsu, China
Zip code: 226407
Copyright©2023 Nantong Hongfu Dali Chemical Co., Ltd.